EFFEBI-PRESS

ANNEX 5.

SYSTEM:

CUSTOMER:

PERFORMER:

TEST REPORT WITH AIR FOR DRY SPRINKLER FIRE FIGHTING SYSTEM

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Following the test it is hereby declared that:

The entire system was visually checked to make sure that all the connections have been made in accordance with the

best working standards.

• Water temperature =

• Room temperature =

• Temperature difference ∆T =

_____ °C

_____ °C

_____ °C (must be ≤ 10 °C)

Seal test

Test pressure =

_____ bar

(must be ≥ 2,5 bar)

Duration of the test = _____ hours

(must be ≥ 24 hours)

The pressure loss is ≤ 0,15 bar

Place

_______________________________

Date

_______________________________

Signature of the customer or representative:

_______________________________

Signature of the performer or representative:

_______________________________

Manuale Tecnico [profilo V]

61

Technical Guide [V-Profile]