EFFEBI-PRESS

ANNEX 3.

SYSTEM:

CUSTOMER:

PERFORMER:

TEST REPORT WITH WATER FOR HEATING SYSTEMS

_____________________________________________________________________________________

_____________________________________________________________________________________

_____________________________________________________________________________________

Following the test it is hereby declared that:

The entire system was visually checked to make sure that all the connections have been made in accordance with the

best working standards.

The pipework has been completely aired out.

The operating pressure equals 10 bar.

• Water temperature =

• Room temperature =

• Temperature difference ∆T =

_____ °C

_____ °C

_____ °C (must be ≤ 10 °C)

Pressure test at room temperature

Operating pressure =

Test Pressure =

(Operating pressure x 1,3)

_____ bar

_____ bar

_____ minutes

The ducts are watertight (∆p = 0)

Duration of the test =

(must be ≥ 30 minutes)

Pressure test in temperature

(to be carried out immediately afterwards)

Max operating temperature =

Test Pressure =

(Operating pressure x 1,3)

_____ °C

_____ bar

_____ minutes

The ducts are watertight (∆p = 0)

Duration of the test =

(must be ≥ 30 minutes)

Place

_______________________________

Date

_______________________________

Signature of the customer or representative:

_______________________________

Signature of the performer or representative:

_______________________________

Manuale Tecnico [profilo V]

57

Technical Guide [V-Profile]