EFFEBI-PRESS

ANNEX 2.

TEST REPORT WITH AIR OR INERT GAS FOR DRINKING WATER AND HEATING SYSTEMS

SYSTEM:

CUSTOMER:

FIRST PERFORMER:

SECOND PERFORMER:

_________________________________________________________________________________

_________________________________________________________________________________

_________________________________________________________________________________

_________________________________________________________________________________

Following the test it is hereby declared that:

Before the assembly, all the seals have been wet

The entire system was visually checked to make sure that all the connections have been made in accordance with the

best working standards.

The system was tested internally in n. ______ sections (each test section must be ≤ 100 litres / 0.1 m

3

)

• Test aeriform fluid used:

• Aeriform fluid temperature =

• Room temperature =

• Temperature difference ∆T =

air

nitrogen

_____ °C

_____ °C

_____ °C (must be ≤ 10 °C)

______________________

Preliminary test

Test Pressure =

_____ bar

(must be = 150 mbar)

Duration of the test =

_____ minutes

(must be ≥ 120 minutes)

The ducts are watertight (∆p = 0)

Main test

Test pressure =

_____ bar

(must be ≤ 3 bar for DN ≤50 and ≤ 1 bar for DN >50)

Duration of the test = _____ minutes

(must be ≥ 30 minutes)

The ducts are watertight (∆p = 0)

Place

_______________________________

Date

_______________________________

Signature of the customer or representative:

____________________________________

Signature of the first performer or representative:

____________________________________

Signature of the second performer or representative:

____________________________________

Manuale Tecnico [profilo V]

55

Technical Guide [V-Profile]